天生桥,Tianshengqiao
1)Tianshengqiao天生桥
1.Analysis and dealing of the line-bar accident of 2~# generator in the Tianshengqiao 1st step hydropower station;天生桥一级水电站2~#发电机线棒事故的分析处理
英文短句/例句

1.Treatment of Cracks on Runner Blade of Turbines In Tianshengqiao Hydropower Station天生桥一级电站水轮机转轮裂纹处理
2.Research on the Improvement of AC Filter in Tianshengqiao Station of Tian-Guang HVDC Project天广直流天生桥站交流滤波器改造研究
3.The Design and Construction of RCC Dam in Tianshengqiao-Ⅱ Hydropower Station天生桥二级水电站碾压混凝土坝的设计与施工
4.Plague focus investigation in the region of Tianshengqiao reservoir in Guizhou贵州省天生桥水电站库区沿岸鼠疫疫源地调查
5.Study on Aeration Mitigation of Cavitation for the Spillway of TIANSHENGQIAO-1 Hydropower Station;天生桥一级水电站溢洪道掺气减蚀研究
6.Treatment of Unsettled Problems on Resident Relocation of Tianshengqiao Ⅱ Hydropower Station;天生桥二级水电站移民遗留问题的对策研究
7.A Report about the Fabricating Penstocks for the Seepage Tunnel of Tianshengqiao Hydroelectric Power Station;天生桥二级水电站三号引水隧洞压力钢管制作
8.Finite element simulative analysis for the concrete arch dam of Tianshengqiao reservoir天生桥水库混凝土拱坝有限元仿真分析
9.Experiment on shutting of emergency overhaul gate in surge shaft of Tianshengqiao cascade II hydropower station天生桥二级水电站事故检修闸门动水下门试验
10.Treatment of Over Vibration in 4# Unit of TSQ-1 Hydropower Station天生桥一级水电站4号机组振摆超标的处理
11.Primary Frequency Regulation Test of Generator Units of Tianshengqiao Hydropower Station天生桥水力发电总厂机组一次调频试验
12.Analysis and Modification on Water-cooling System of Tianshengqiao Converter Station天生桥换流站水冷却系统故障分析与改造
13.Choice and Similarity Calculation of Ventilation System for Hydrogenerator of Tian Shengqiao Water Power Station StepⅡ天生桥Ⅱ级电站水轮发电机通风系统选择及相似计算
14.INVESTIGATION OF ENGINEERING SETTLEMENT AND PAYMENT IN THE CONTRACT OF THE TIANSHENGQIAO HYDROPOWER PROJECT;天生桥水电站工程承包合同的工程结算支付探析
15.Tianshengqiao DC Converter Station Blocking Analysis and Prevention天生桥换流站直流闭锁原因分析处理及预防改进
16.The Fault Analysis and Improvement Suggestion on DC Filter Capacitor at Converter Station of TSQ天生桥换流站直流滤波电容器故障原因分析及改进建议
17.Reformation of Protection against Lightning for the Safety Monitoring Automation System for Diversion Tunnel in TSQ Ⅱ Hydropower Station天生桥Ⅱ级水电站引水隧洞安全监测系统防雷改造
18.Design and Practice of Plastic Concrete Anti-Seepage Wall in the Auxiliary Dam Foundation of Tianshengqiao Hydropower Station天生桥水电站副坝基础塑性混凝土防渗墙设计与实践
相关短句/例句

natural arch,natural bridge天生桥<地>
3)Tianshengqiao Reservoir天生桥水库
1.Review on the design, manufacture and installation of metal structures for Tianshengqiao Reservoir;天生桥水库金属结构设计制造与安装回顾
2.Finite element simulative analysis for the concrete arch dam of Tianshengqiao reservoir天生桥水库混凝土拱坝有限元仿真分析
4)Tian sheng qiao Reservoir天生桥枢纽
5)TSQ-Ⅰ天生桥一级
1.Presentation on the primary circuit design in the bidding design stage for TSQ-ⅠHydropower Project;天生桥一级水电站招标设计阶段电工一次设计介绍
6)Tianshengqiao hydropower station天生桥水电站
1.Design and Practice of Plastic Concrete Anti-Seepage Wall in the Auxiliary Dam Foundation of Tianshengqiao Hydropower Station天生桥水电站副坝基础塑性混凝土防渗墙设计与实践
2.Viewed from the relationship of the change of the switching on system design in the Tianshengqiao Hydropower Station with the power transmission from west to east, the planning of power system shall be made on the basis of the national macro control.从天生桥水电站接入系统设计的变迁与西电东送的关系可以看出 ,电力系统的规划应该是在国家宏观调控的基础上进行的 ,只有站在西电东送的高层面上 ,才能看到云南、贵州两省丰富的能源资源开发与广东省国民经济发展的密切关系 ,实现东西部的共同发展、共同富裕。
延伸阅读

阜平天生桥风景区
阜平天生桥风景区
天生桥瀑布空中草原云海奇观原始森林冰瀑奇观天桥瀑布(瑶台瀑布)天生桥各景点名称艺术讲解绝谷回声观翠原始次生林藏兵洞砚台瀑 原始次生林藏兵洞 白草坨山神头 大洼瀑鬼脸崖 坐佛峰睡石瀑 耕梨瀑双龙瀑 观翠台